Six Documents · One CSA · One Decision

Engagement Package

Six documents. One decision: authorise an LOI/MOU and open a Joint Working Group.

01
Decision Brief
The one action, the goal it serves, and the figures behind it. Four minutes.
4 min DOC 04 Action
Open document ↗
02
Feedstock System Assessment
Philadelphia’s system as it actually operates — what the City collects, where it goes, and what the City’s own plan says.
8 min DOC 01 Evidence
Open document ↗
03
Circular Supply Proposal
One Circular Supply Agreement. The Beneficiation Fee, the Circular Royalty™, the phases, and the condition precedent.
12 min DOC 02 Commercial
Open document ↗
04
Economic Impact Report
The 30-year model on one stated basis — including where this costs more than what the City pays today.
10 min DOC 03 Model
Open document ↗
05
Community Benefits
What changes for Philadelphia residents — and what does not. Plain language.
5 min DOC 06 Residents
Open document ↗
WHAT CHANGES
What Adopting Carbotura Changes
A plain-language tour of how a 30-year ACM commitment changes a community’s fiscal position, employment, and material system. Generic illustrative figures.
Open ↗
Planning basis: Carbotura standard parameters against published City of Philadelphia figures (phila.gov, wastedive.com; read 23 Nov 2026). Beneficiation Fee set at $100/ton. Phase Initial is sized against the 600,000 tpy city-collected stream; Phase Medium and Expanded reach into the nearly 1.5 million tpy the City’s 2017 plan reported as disposed citywide (planning basis, to be confirmed), through other municipalities and commercial haulers joining the City’s CSA on its consent, behind the City’s own priority on availability and capacity. Published figures for how much goes to waste-to-energy differ and no single figure is asserted here. No site has been identified. Carbotura has no facility at or past Commercial Operation Date; the first is in Pennsylvania, in deployment, targeted late 2027 to early 2028.